Professional Design Services for Fire Station

Bid/RFP Status: 
Closed - no longer accepting bids and proposals
Bid/RFP Due Date: 
Thursday, March 31, 2022 - 4:30pm
Back to Bids/RFPs

SUMMARY
The City of Platteville is proposing to build a new Fire Station at the current OE Gray Learning Center Building located at 155 W. Lewis Street, Platteville, WI 53818. The city is requesting proposals from qualified architect/engineer (A/E) consultants to be part of a team to perform professional services for the design of the new Fire Station. Design services shall include landscape design, architectural design, interior design, site civil, plumbing, mechanical, electrical, and telecommunication engineering services. The design proposal should include the following phases for program verification:

  1. Schematic design (Consider standalone fire station and provide recommendation as to whether training/additional space for education and service-based organizations could be included in joint facility.)
  2. Design development – Prepare detail design documents (plans & specifications) for the approved design and layout
  3. Construction documents – Plans, specifications, and contract
  4. Bidding and construction administration services – with site inspections biweekly

Please view the complete Request for Proposals document for full details.  

BACKGROUND
The City of Platteville, WI is currently developing a new Fire Station that will replace the existing Fire Station located at 275 E Main Street, Platteville, WI 53818. In 2021 the City of Platteville received a Fire Department Comprehensive Analysis report which indicated the current OE Gray Learning Center Building at 155 W. Lewis Street, Platteville, WI 53818 as the most suitable location for an updated/new fire station. A space need analysis indicated an anticipated facility size between 28,000 to 32,000 square feet. The intent of the city is to retain a design team that will develop a conceptual schematic design. After owner approval of the selected schematic designs, the design team will be authorized to begin development and proceed with the creation of construction documents. Prior to the design development stage, the city, working with the selected consultant, is expected to select a Construction Manager to manage bidding and construction of the project and to provide input on the design development and specifications. The city reserves the option of moving forward with a traditional hard bid, general contractor option.

REQUEST FOR PROPOSAL INFORMATION
It is the responsibility of the Consultant to carefully read the entire Request for Proposal, which contains provisions applicable to successful completion and submission of an RFP. If any ambiguity, inconsistencies, or errors are discovered in the RFP, the city must be notified in writing. Only interpretations or corrections of the RFP made in writing through addenda by the city will be considered binding. The city must receive all requests for interpretations or corrections no later than the date specified in the RFP timetable. The RFP consists of all documents identified in the Scope of Work section of the RFP.

SUBMISSION OF PROPOSAL
The following information must appear on the lower left-hand corner of the container:
RFP for Professional Design Services for City of Platteville Fire Station
The information must be addressed to: City Manager, 75 N. Bonson St., Platteville, WI 53818.

All submittals by mail, email or in person must be received no later than 4:30 p.m. on March 31, 2021. Hand carried proposals may be delivered to the above address ONLY between the hours of 8:00 a.m. to 4:30 p.m., Monday through Friday, excluding holidays observed by the city.

Proposers are responsible for informing any commercial delivery service, if used, of all delivery requirements and for ensuring that the required address information appears on the outer wrapper or envelope used by such service.

Electronic proposals (email) may be submitted via citymanager@platteville.org. PDF format shall be utilized in this format.