Downtown Parking & Traffic Flow Analysis Study

The Downtown Engineering team was asked to analyze the downtown Platteville parking and traffic situation. The Public Works Director and city engineer, Delta 3, requested the analysis to determine if existing conditions are adequate for current and future demand.